1. UPSC Mains GSM3-2019: Q7: Agro-National Watershed Project
  2. Related questions in the past UPSC Mains Exams
  3. Introduction: National Watershed Project
  4. Conclusion: National Watershed Project Appreciate kro
  5. Mistakes in National Watershed Project Answer
  6. Model Answer in Hindi

UPSC Mains GSM3-2019: Q7: Agro-National Watershed Project

  • Elaborate on the impact of the National Watershed Project in increasing agricultural production from water-stressed areas.
  • (जल-प्रतिबलित क्षेत्रों से कृषि उत्पादन में वृद्धि करने में जल-विभाजक परियोजना के प्रभाव को सविस्तार स्पष्ट कीजिए |) 10m, 150 words
  • Answer Source: Kurukshetra 2017 November month issue on irrigation

Related questions in the past UPSC Mains Exams

  • GSM3/2016: What is water-use efficiency? Describe the role of micro-irrigation in increasing the water-use efficiency.
  • GSM3/2014: Drought has been recognised as a disaster in view of its party expense, temporal duration, slow onset and lasting effect on various vulnerable sections. With a focus on the September 2010 guidelines from the National disaster management authority, discuss the mechanism for preparedness to deal with the El Nino and La Nina fallouts in India.
  • GSM3/2017: Not many years ago, river linking was a concept but it is becoming a reality in the country. Discuss the advantages of river linking and its possible impact on the environment.
  • GSM3/2013: Enumerate the National Water Policy of India. Taking river Ganges as an example, discuss the strategies which may be adopted for river water pollution control and management. What are the legal provisions for management and handling of hazardous wastes in India?

Introduction: National Watershed Project

UPSC Mains Model Answer Writing Framework for National Watershed Project Question

  • (Definition) Watershed is geo-hydrological unit of land, which collects water and drains it through a common point. Watershed management basically involves storage and recharge of groundwater through various methods like percolation tanks, recharge wells and artificial ponds.
  • (origin of the scheme) In the 1970s, Government of India had launched:
    • Drought Prone Areas Program (DPAP)
    • Desert Development Program (DDP) to address the scarcity of water in India.
  • However, the term ‘watershed management’ gained currency since the 1990s. Government launched:
    • Integrated Watershed Development Program (IWDP)
    • National Watershed Development Program for Rainfed Areas (NWDPRA) with the help of World Bank.
  • In 2015, the Ministry of Rural Development and World Bank signed a loan agreement to consolidate these initiatives under “Neeranchal National Watershed Project (NWP)” –

This question is from an obscure scheme, so in real exam is not expected to have such encyclopedia knowledge as I’ve given in the introduction. I’ve given it here only for reference.

Body1: National Watershed Project (NWP): Features

  • Boss? Ministry of Rural Development
  • Finance: 50% loan by World, rest by the Union. Total >2k crores.
  • Timeline: It will be implemented over a period of 6 years  (2016-21).
  • While all the states and union territories of India are eligible for it but primary focus will be paid to the nine States facing higher level of water scarcity viz. Andhra Pradesh, Chattisgarh, Gujarat, Jharkhand, Madhya Pradesh, Maharashtra, Odisha, Rajasthan and Telangana.
  • It’ll create watershed assets for the Pradhan Mantri Krishi Sinchayi Yojana.
  • Watershed “plus” approach= local participation, skilling, employment opportunities. Strategies ensure that watershed is not discontinued after funding stops.

Body2: NWP: How Agro Production Will Improve?

  • While India accounts for more than 17% of the population of the world, it has barely 4% of the world’s fresh water resources. Majority of the Indian farmers are dependent on the rainfall for their irrigation purposes.
  • Due to successive droughts in 2014 and 2015, Indian agriculture has witnessed zero to negative annual growth. Even today, we are unable to increase the annual growth of agriculture into two digits. The scarcity of water is among the prime reasons for this.
  • National Watershed Project’s assets will help reducing surface runoff of rainwater, increasing recharge of ground water.
  • When completed, NWP will convert 12% of wasteland into arable land.
  • Even in the areas where large size dams and irrigation canals are not available,  the availability of water will increase.
  • Special attention is paid to the needs of small and marginal farmers. And with convergence with other schemes such as  KUSUM solar-irrigation pumps, Even they will be able to do multiple cropping per year. 
  • Further, better availability of water and green fodder will improve the milk yield of the cattle.

Conclusion: National Watershed Project Appreciate kro

  • Thus, national water project will help improving agriculture and milk production in water-stressed area.
  • This’ll help in a long way to double farmers’ income by 2022.

Mistakes in National Watershed Project Answer

  • Directly you won’t have sufficient content for the project itself. So, You have to enrich the answer by explaining what exactly is a watershed? how it helps in improving the agriculture production? logical connectives, Some factoids/data, name of organizations etc.
  • Type: Fact-based contemporary Q.
  • Span: >D-2 Years (because loan agreement signed in 2015, project timespan 2016-2021).
  • Difficulty Level: Medium. Water crisis was a very hot topic for this year. So all candidates would have prepared data and material for it. But this question deals with impact assessment of a specific non-flagship scheme. Had they asked about the Pradhan Mantri Krishi sinchai Yojana or PM Kisan Yojana then scene would have been different. So most candidates may have fallen short of some points in that regard. While senior players and those with geography as an optional subject may have been able to frame a decent answer.
  • Score: 4/> out of 10. मुझे लगता है कई बच्चों ने ठीक से लॉजिकली कनेक्ट करके बात नहीं रखी होगी कि कैसे वाटरशेड से कृषि उत्पादन बढ़ता है, सिर्फ हवाबाजी करते हुए “बहुत लाभ होता है बहुत लाभ होता है type का generic ढिंढोरा  पीटा होगा”

Model Answer in Hindi

Introduction (परिचय)

परिचय: राष्ट्रीय जलसंभर परियोजना

  • (परिभाषा) वाटरशेड -भूमि की वह भूजल इकाई है, जो पानी एकत्रण का कार्य करती है और एक स्थान से इसे प्रवाहित करती है। वाटरशेड प्रबंधन में मूल रूप से विभिन्न तरीकों जैसे कि तालाबों में रिसाव के द्वारा पानी का भण्डारण, कुओं एवं कृत्रिम तालाबों के माध्यम से भूजल का भंडारण और पुनर्भरण शामिल है।
  • (उत्पत्ति ) 1970 के दशक में, भारत सरकार ने शुरुआत की :
    • सूखा प्रवण क्षेत्र कार्यक्रम
    • भारत में पानी की कमी को दूर करने के लिए मरुस्थलीय विकास कार्यक्रम  ।
  • हालांकि, 1990 के दशक में ‘वाटरशेड मैनेजमेंट’ शब्द ज्यादा प्रचलित हुआ जब सरकार द्वारा निम्न कार्यक्रम शुरू किए गए:
    • एकीकृत जलसंग्रहण विकास कार्यक्रम
    • विश्व बैंक की मदद से वर्षा आधारित क्षेत्रों के लिए राष्ट्रीय जलसंग्रहण विकास कार्यक्रम।
  • वर्ष 2015 में, ग्रामीण विकास मंत्रालय एवं विश्व बैंक ने “नीरंचल नेशनल वाटरशेड प्रोजेक्ट ” के अन्तर्गत इन पहलों को समेकित करने के लिए एक ऋण-समझौते पर हस्ताक्षर किए.

Body1: राष्ट्रीय जलग्रहण परियोजना: विशेषताएं

  • ग्रामीण विकास मंत्रालय की योजना.
  • वित्त: विश्व बैंक द्वारा 50% ऋण, बांकी संघ द्वारा |  कुल> 2000करोड़।
  • समयसीमा : इसे 6 वर्ष (2016-21) की अवधि में लागू किया जाएगा।
  • हालांकि भारत के सभी राज्य और केंद्र शासित प्रदेश इसके लिए पात्र हैं, लेकिन पानी की कमी के उच्च स्तर का सामना करने वाले नौ राज्यों को प्राथमिकता के आधार पर  वरीयता दी जाएगी जैसे – आंध्र प्रदेश, छत्तीसगढ़, गुजरात, झारखंड, मध्य प्रदेश, महाराष्ट्र, ओडिशा, राजस्थान और तेलंगाना।
  • यह प्रधानमंत्री कृषि सिचाई योजना के लिए जलसंग्रहण के रूप में संपत्ति का सृजन करेंगे ।
  • वाटरशेड “+”  अभिगम यानि की स्थानीय भागीदारी, कौशल, रोजगार के अवसर।
  • ऐसी रणनीतियाँ बनाई गयी है ताकि वित्तीय मदद समाप्त  होने के बाद वाटरशेड बंद नहीं होगा।

Body2 : राष्ट्रीय जलग्रहण परियोजना: कृषि उत्पादन में कैसे सुधार होगा ?

  • हालांकि भारत में दुनिया की आबादी का 17% से अधिक हिस्सा है, जबकि इसके पास दुनिया के ताजे जल संसाधनों का मुश्किल से 4% ही है। अधिकांश भारतीय किसान सिंचाई के लिए वर्षा पर ही  निर्भर हैं।
  • वर्ष 2014 और 2015 में लगातार सूखे के कारण, भारतीय कृषि में शून्य से नकारात्मक वार्षिक वृद्धि देखी गई है।
  • आज भी हम कृषि की वार्षिक वृद्धि को दो अंकों तक नहीं पंहुचा पाए हैं। पानी की कमी इसके प्रमुख कारणों में से है।
  • राष्ट्रीय वाटरशेड परियोजना की परिसंपत्तियाँ वर्षा जल की सतह अपवाह को कम करने में मदद करेंगी, जिससे भूजल का पुनर्भरण बढ़ेगा।
  • पूरा होने पर राष्ट्रीय वाटरशेड परियोजना, बंजर भूमि के 12% को कृषि योग्य भूमि में बदल देगी ।
  • यहां तक कि जिन क्षेत्रों में बड़े बांध और सिंचाई हेतु नहरें उपलब्ध नहीं हैं, वहां भी पानी की उपलब्धता बढ़ेगी।
  • छोटे और सीमांत किसानों की जरूरतों पर विशेष ध्यान दिया जाता है। कुसुम सौर-सिंचाई पंप जैसी अन्य योजनाओं के साथ वे अपनी फसल में कई गुना वृद्धि  भी कर सकेंगे।
  • पानी और हरे चारे की बेहतर उपलब्धता से मवेशियों की दूध की पैदावार में सुधार होगा।

Conclusion (निष्कर्ष): परियोजना की सराहना

  • इस प्रकार, राष्ट्रीय जलसंग्रहण परियोजना मरुस्थलीय क्षेत्र में कृषि और दूध उत्पादन में सुधार करने में मदद करेगी, जो 2022 तक किसानों की आय को दोगुना करने के लिए काफी मदद करेगा|

Visit Mrunal.org/Mains for more on the Art of Answer-Writing